![]() |
Putting down the insulated floor before we pour concrete |
![]() |
The spa with the main drains plumbed in |
![]() |
Ready for concrete |
![]() |
We added the forms to the steps so they would be bull-nosed. |
![]() |
Pouring concrete |
![]() |
We had a crew here.. Josh is in red by the cement truck. |
![]() |
Nice and smooth |
![]() |
Eli and Sampson on the rock piles! |
![]() |
Playing on the dried concrete |
![]() |
We had to add a layer of plaster on top of the concrete to make it smooth since they had to dry stack the deep end to get the concrete to stick. |
![]() |
After our big rain storm. Hey.. at least it holds water. We still have to paint the sealant and EVM coating on top of this layer. |
No comments:
Post a Comment